I am doing a bathroom over I will be tiling the walls from floor to ceiling and the floor which do I do first the walls or the floor? Also which side of the durock do I tile on?
![]() |
I am doing a bathroom over I will be tiling the walls from floor to ceiling and the floor which do I do first the walls or the floor? Also which side of the durock do I tile on?
You would do the walls first so you will get a perfect grout line along the perimeter. Install the cement board with the printing showing out so you can read it.
| All times are GMT -7. The time now is 08:55 PM. |