Basement Bathroom Rough In Questions
I'm getting ready to rough in a new bathroom in my basement and I have a few questions. I would really appreciate any advice.
I will be breaking into an existing 4" sewer pipe under the floor. Does the connection to this pipe (3" from my new bathroom group) have to enter the existing pipe above center? I will be connecting with a 4X4X3 reducing wye.
Same question further up the line when the 2" drain pipe from the shower/lav connects to the 3" from the WC. This one will be wet venting.
I'm a bit concerned about depth. If all of the connections need to be above center I may run out of floor to bury my pipe in.
I will provide a scetch once I get a few basics out of the way.
Another question regarding closet flanges...
How do I install the toilet flange after I repour the floor? The ones I have seen a meant to go outside the 3" pipe that would be sticking up. I do not know how thick my floor will be once I level and tile. It seems like I might have to chip away some of the new floor to get the flange over the pipe after I level and tile. Am I missing something?
Thanks in adavance,