I want to pump an under-slab reservoir for a bathroom that is below grade. I need to connect a 2 inch wye into the main stack which is near-horizontal 4 inch ABS. There is a clean-out a few inches uphill from a toilet. Can I just extend the clean-out and add the wye? Alternatively, I would have to cut the main stack and how do I insert the wye into a stack that will not allow movement because of existing junctions.
