How do I tie into an existing cast iron waste stack?
I'm considering adding a 2nd bath to a house that was built in 1951. The cast iron waste stack is in an easily accessible location, but the only vertical space available is below 3 other elbow & just above the lowest why used for clean out. What's the approach for tying into this location? Do I need to lift the upper 3 junctions & pull out the straight piece, cut it, and splice in a new elbow & then lower the 3 connections back down? Or... would I need to pull the upper 3 joints apart & rebuild... or maybe hire a plumber? Also, I'm assuming I cannot tie an entire new bathroom into an existing drain run? Guidance appreciated.