We purchased a home last year and in the main bath, some moron took a jacuzzi tub and sunk it below the floor level so that you actually have to sit on the floor to get in. Needless to say, it's coming out. We want to put a roll in shower in this space. We will need to put in new floor joists and make it structurally sound again and in the process leave about 2? For mortar and tile. Before tiling, we plan on applying the orange membrane on all the walls and floor and overlapping the threshold. I was wanting to put glass tiles on the walls and either pebble tec or non slip tiles on the floor. Does anybody see a problem with our plan? Thanks.
