Adding a basement bathroom?
I am going to be adding a bathroom to the basement... when I patch into the main stack, should I patch in with a y tee further down the run from the 90 bend. If so, how far should I go before adding the additional toilet, sink and tub lines. I was wondering if I should vent the toilet, and if I can into the main stack using it as a wet/dry vent. I was also planning on venting the sink into the stack be adding a tee 40" up from the finished floor. I was not going to vent the tub since the overflow should add the air needed to vent the drain. Also, should I run the toilet independently into the drain from the tub or can I have them all connect and run through each other? And to patch into the drain line under the concrete floor, can I use a rubber boot? Thanks for the help