Pressure release valve installation
I recently had a leak by my city meter here in San Antonio Texas and was told by the plumber that the installation was not correct. The depth for the manual shut off valve and PRV was only 4-5 inches below the grass and that the PRV should be next to the meter before the manual shut off valve. I had another plumber confirm this but when the builder had his plumbers come out to inspect they seemed like it was no big deal. I need help to know if this is substandard work or not following the codes for plumbing?