I have had a 40' x 60' pole parn with 6"x6" treadted poles. I am planning on pouring a concrete slab. I live in South Alabama where freezing is short lived and rarely below 26 if then. People do not usually use rock under the slab here. I was wondering how much footing if any I need between the poles?