I recently bought an older home. Started remodeling the bathroom on the top floor and realized after opening some walls, that the entire top floor is old knob & tube electrical. I figured my best course of action would be to run a subpanel up to the top floor and rewire the entire top floor from the attic. My question is do I go with a 70amp sub or a 100amp. And what wire do I use? No.6 for 70amp and No.4 for 100amp? Any help would be appreciated. Thanks!