Basement bathroom rough in
My house was built in 2002 and the basement was roughed in for a bathroom. There is a larger pipe sticking out from the slab, (obviously for the toilet)and there is a 2" pipe sticking out as well. My question is is that 2" pipe for a shower, tub, or shower/tub combo or does it not matter. I was under the impression that a 1.5" pipe is for a tub and a 2" is for a shower but I'm really not clear on this. Please help I really want a full bathroom with tub/shower combo but breaking up the cement floor is not an option.
Thanks, Crystal