Getting ready to tie in the drain pipes for a new bathroom into my existing soil stack. Before I cut into it, I wanted to make sure that what I have in mind will be acceptable. Because of the fittings already on the stack, there is not a whole lot of room to add on without dropping kind of low. The following picture shows the existing stack.
http://i566.photobucket.com/albums/s...ee12/stack.jpg
Here is what I have planned. The 3" toilet/shower drain comes in from the right (perpendicular to the joists) and the sink drain comes almost straight on (between the joists).
http://i566.photobucket.com/albums/s...2/stack2-1.jpg
I know that there is currently an S-trap installed for an existing tub (this can be seen in the images). I would really prefer to not mess with what's already in place, but if reworking the whole stack in a way that replaces the s-trap is a good idea, I would certainly consider it. The tub does gurgle loudly when draining - if that's related.
Thanks.