Question on install of basement shower, tiled walls, prefab base
I'm in the process of installing a 36in sq shower in my basement. Please let me know if this process is correct:
1) frame out surround, 2x4s, spaced 36in for base to fit, drain and plumbing run
2) put shower base (w/ drain installed) down onto concrete (do I need to put some mortar or anything down below this?)
3) put cement board up to height of where tiling will end, then butt together w/ greenboard for area above tiling, tape seams (is this right, I'm not sure where the cement board should end, will regular self adhesive fiberglass tape work? Also, how high should tiling go?)
4) install tiling up wall
5) seal grout
6) caulk between bottom of tile and shower base
done?
Thanks!