What is a stub out?? My contract calls for contractor to have the plumber "stub-out" a bathroom (1/2 bath) in the attic. I anticipated a capped off place for toilet and a capped off drain and water pipes for a sink plus vents. Don't see any thing and I get some circular logic from the contractor. Is there a generally accepted definition?
Thanks in advance