Installing tub/shower in unfinished basement
Hello,
I'm finishing off my basement and there is a 1-1/2 stub for a tub or shower. It holds water so I'm assuming there's a P trap in the cement floor and there's a vent stack nearby too. However, the stub is only 11 3/4 inches from a concrete wall and has cement all the way around it. My concerns are...
1- I've read that you usually need a square cutout in the concrete to facilitate the piping below the tub. Correct? What about a shower?
2- The stub seems close to the cement wall. Is there a standard, or typical distance, from the end of the tub to the drain? I'm thinking I may need to move the pipe unless I can find a shower or tub that will fit.
Thanks,
-r.