I am starting my rough in plumb. This is new construction and the finish floor is not in place and toilets are the first and second floor. This is all PVC. When do I install the closet flange? During the rough in stage of after the finish floor? Will the plumbing inspector be looking for the closet flange in the rough in inspection?
Also I was planning on running a 3x4 closet bend, 4” stub up through the floor then attaching the closet flange to the stub up. Is there anything else that I will need? Is there something else which is mounted to the plywood sub floor before the closet flange? Thank you.