My tile contractor laid a mud bed for a shower pan three days ago. The mud looked a bit soupy and has resulted in a bed with little or no slope toward the drain in some spots. He suggests troweling out some additional mud on top of the dry bed to create the proper slope. He says the new mud will bond to the existing mud. Is this acceptable?