Why does the code require a #2 wire for a 100 amp double-pole
1) I have wired a subpanel feed with #2 ( or #3) wires protected with a 2 pole 100amp breaker. I am confused on why the code requres this. Doesn't each wire only carry half the load (50 A) max.
2) Does a subpanel on a second floor require a grounding rod (or water pipe) connection, or just the ground wire back to the main panel?
3) Is the bonding lug ( connected to grounding wire) sufficient to ground the sub-panel, or does the ground bar have to be bonded?
4) Will a 1-1/4 inch flex conduit be large enough for 3-#2 wires and a #8 ground wire
Comment on cruiser2000's post
Sorry for calculation error 24 Kva or 24000 watts