Hi there,
I'm building a bathroom in basement. I do have roughin (1) 3" pipe for toilet and then (1) 1.5" for shower and (1) 1.5" and (1) 2" for lavatory. I have an existing sewage pit (new) and I purchased a sewage pump Diamond 1/2 hp 8200 gpm.
How do I hook everything up? I'm puzzled cause I thought all drains were 2' not 1.5 "
