I am having my baserment finished. I have had French drains installed with battery back up. Contractor installed vapor barrier, mastic basement floor, #15 paper put on top of that , more mastic and then plastic on top of that. Sleepers (2x4) exterier treated lumber with exterior 3/4 treated (b/c) on top as sub floor. Will put wood or an other covering on top of that to finish. My question. Sleepers are flooting. When I walk on plywood floor, a number of areas flex, bounce. When brought to attention of contractor, he said floor needs time to settle. Bounce will disappear. He said he did put shims under some 2x4 to level floor. Keeps telling me, nothing to worry about. IS HE CORRECT? Or do I have something to be concerned about?
