I am removing the tub/shower from our master bath (ground floor; slab foundation); replacing the shower/tub with a luxurious shower. The copper supply lines need to be moved 18 inches to accommodate the new shower. The supply lines are in slab. If the answer already exists in the forum, please indicate. Otherwise, please provide direction on most practical way(s) to relocate the in-slab 1/2'' copper supply lines.