I am putting in a bathroom in my basement. It is new construction and has the bath already roughed in for a sink, toilet and shower. The shower drain is about 14" away from where it actually needs to be (not sure what the builder was thinking). I have already demoed the concrete from the existing drain location to where I need it relocated (14" away). The existing drain does have a trap that is 20" below the concrete surface level tied into the 4" toilet waste drain running at about a 45 degree angle. My question is;
1.) Can I tie the new shower location directly into the old shower drain and use the existing trap since I have about 20" of vertical pipe to work with?
2.) If no... and is because I need to have a new trap installed in the new location directly below the drain, can I still have the other trap remain and then just tie into the 20" of vertical pipe?
I am trying to minimize my amount of concrete work for only having to move the drain 14". Thanks
http://www.amsa.org/images/Drain1.jpg