I am installing a 2000w 120v power inverter in to new construction with no "grid power". My question is: Is it better to split the Hot wire in the main panel box for L1-L2 or better to install a sub panel and do the split there. I am the owner/builder and not an electrician as I'm sure you can tell. I am using a 125 amp main panel with 4-15amp, 2-20amp and 1-30amp circuits. Thanks in advance