Install New Basement Half Bath Over Slab
Hello,
I plan to install a new half bath in a basement which has a concrete slab. The house is in Philadelphia. The main waste stack is 4" cast iron and it goes out to the city sewer under the slab. I want to find the horizontal run of the waste line under the slab and tap into it for the new toilet.
Here are my questions:
1. Does anyone know if the code in Philadelphia requires that I tap into the horizontal run with cast iron? Or can I use a PVC wye with shielded hub-less connectors and clamps, etc.?
2. If I can use PVC, is there a particular PVC thickness for use under the slab or just the stuff sold at the local retail giant?
3. What is the preferred size for the toilet waste line? Is it 3" or 4"?
4. Regarding venting, must I install a vent for the toilet? I've heard something about "Philadelphia Single Stack venting" and was wondering if there is a way to get away without it.
Thanks in advance!