Old entry way sub floor rotted, it was above a non vented 6 x 6 x 7 foot hole. I want to fill in the hole and put in a concrete floor for tile. What materials and in what order should I use to fill the hole? Sand appears to be the main ground material present now, possibly clay beneath. Don't anticipate any water intrusion.