I plan on pouring a concrete retaining wall 24 inches high 12 in above and below grade. One side of the wall will have 1 ft exposed to the eye and I'm trying to figure out the best way to finish that section. My plans were to allow the concrete to begin to set up and after it has set a good amount to pull the face of the form and do a sponge finish on it? Any ideas or unseen problems?
