Must I use gravel around a new 2" shower drain before filling trench w/ concrete or is the clay soil I removed from the trench adequate, providing I pack well? There will be a minimum of 4" of concrete over the 2" PVC drain line. Is it necessary to replace plastic membrane before concrete is added? It's a fairly dry location and will be covered w/ ceramic tile. Thanks...
