Backfilling to the foundation
I recently dug a trench from the corner of the front of the house to run flex pipe 30 feet away from the house to connect the down spout to the gutter into. That is done. Before this, the down spout whittled away at the dirt in front of the house as water was trapped and then ran off.
Now that the spout issue is resolved, I would like to raise the soil up about 8 inches to fill in the hole left by the runoff, not my digging. The 8 inches would match the rest of the soil against the house.
I am concerned about putting too much pressure against the foundation. Should I used 4 inches of gravel and then 4 inches of topsoil? Or does it really matter for an 8 inch strip, probably 8 feet long?
Thanks...