Help, I have a concrete floor in the basement about 300 square ft. floore has black mastic or tar which I am srcaping off as much as possible. Concrete floor is not in good shape it has some bomps and crack lines, can I do a mud job over about 1" tick, can you please advice the procedure of this project, any advice is very apreciated.
Thank you Enzo Degregorio