Cause of flaking and pitting of new concrete
We had new concrete installed about 8 weeks ago. It was installed at the end of November, beginning of December. It was getting cold and I voiced my concern to our contractor. The subcontractor installed our garage footings, floor and a large section in front of the garage which is NOT flaking or pitting. Then, several weeks later when it was getting cold they installed the last section. About 2 weeks ago it started to flake and pit. The subcontractor said it was caused by salt dripping from our vehicles. We don't leave our vehicles parked on the driveway. He offered to "fix" it in the spring. We would like it replaced. Also, what methods would they use to fix it, and would it last?
Thanks