Wanting to learn to estimate how to do a material take-off for framing on blue prints
![]() |
Wanting to learn to estimate how to do a material take-off for framing on blue prints
For studding, I allowed one stud for each foot of wall. This gave me waste factor and any jack studs needed. Plates were length of wall times 3.
Good luck
Chuck
| All times are GMT -7. The time now is 10:13 AM. |