I am instaling corner shower with curved doors one front edge 1/4 in. 3/8 in center 1/4 in.at other corner. The floor is cermic tile, how do I fix a form for pour floor leveing compound, I wonder if using clay ( play dough) as a form in front, set base, make level remove and just pour concrete base leveler. Would work. Any other suggestion.

