Replaced a 4" cast vertical waste pipe with 4" PVC and replumbed 3 bathrooms. Inspection went well except the inspector wants me to install a test tee? At the base of the replaced stack for a water test. I have plugged all the drain openings, now I assume there is some type of tee that has a valve in it to shut the trunk line down so we can fill it with water to see if it holds. Then after that I guess you remove the test tee?
What does he mean asking for a water test? And where to find a 4" test tee?
