Electrician must pull another 25 feet of a set 3phase 4wire 500kmcm, only the head where the rope in attached to the capstan leaves no more room to pull.
To solve this problem a smaller rope with a number of half hitches is used to pull the cable set and my question is thus, what is the best method to tie the hitches for quick release and quick repositioning on the cable set?
