Multi meters with 400amp service
I am in the process of upgrading the 70 amp panel on a 9 units building to a 100 amp and changed the wire to 1/o ready to connect to the meter of each unit. My question is what is the best way to configure or reconfigure the 400 amp incoming service to maximize the efficiency and cost effectiveness?
Currently the 400 amp service comes into a main disconnect box with a 350 amp fuse serving 2 meter banks of 5 meters and disconnect boxes with 200 amp each.
Thank you for looking into question and providing guidance and advise.