Ask Me Help Desk

Ask Me Help Desk (https://www.askmehelpdesk.com/forum.php)
-   Plumbing (https://www.askmehelpdesk.com/forumdisplay.php?f=259)
-   -   When is sch 80 pvc required (https://www.askmehelpdesk.com/showthread.php?t=428948)

  • Dec 28, 2009, 12:54 PM
    CivilEng
    When is sch 80 pvc required
    I want to create indoor water storage for chlorine contact time in a small public water system out of 12 inch pipe in a vertical switchback configuration. It will stand on end on a concrete floor and be bracketed to a block wall. Will sch 40 PVC be sufficient or is sch 80 necessary and why?
  • Dec 28, 2009, 01:35 PM
    afaroo

    Here is some info
    PVC is for drainage and cold water lines. CVPC is for hot water lines.
    Schedule #20 is used in lighter applications with not much pressure.
    Schedule #40 is the most used in water piping and drainage.
    Schedule #80 is used in applications that require a heavier stronger pipe such as a commercial contract would call for, I hope this will help you, Thanks.

    John

  • All times are GMT -7. The time now is 07:16 PM.