We just built a house. It has a walk out basement. The house is all done but the walkout is not complete. The open part is 50 ft long. It has 2x8 for walls, plywood on the outside with house wrap. I live in Vermont. Cold up here. Right now I do not have insulation in the basement wall because it is frosty on the inside of the wall between the studs. Is this because it is not finished and the cold is seeping in? Also I will be putting up siding up over the wall outside soon, but is it all right to insulate the wall and put sheetrock up right now before I side the outside. Do I use plastic as a bearier before the sheetrock? I do not want mold issue. Give me some suggestions on what to do? Thanks
