Need to test 7 new gas lines before inspection. However, would like to have it done Simultaneously. I have the compresor and 7 gauges. They are connected to 3/4" nipples
that is connected to the 11/2" lines. I undrestand that a manifold aperatus could be implemented. If so need the line items to acquire.
Thank you
Josh