Ok, I've been reading a lot of the questions and answers and still am slightly confused. I set the drain(adjustable) after chiseling away concrete and cutting existing drain pipe(from previous fiberglass shower). The lower flange is slightly recessed below floor level(local plumber advised this)to disallow any pooling. Now here is the first question. Did I install this properly(not glued yet-PVC)? Secondly, do I put the shower pan in first and then mud(pitch), or vice a versa? This has been troubling me for about three days now. Help!:confused: