I have customer that needs to upgrade his service from 800Amps to 1200Amps. He currently has a 120/240V 3 phase system and a 120/240V System With 2 separate Meters. I am advising that he upgrade and go to a 1200Amp 480V 3 phase system and transform down for existing loads. Will he save any costs on his electric bill over time with a single serevice at 480/277V? If so what approx.