  • Nov 4, 2009, 06:47 PM
    dnweigne
    Temporary power pole
    What does an electrical inspector check for on a t-pole inspection?
  • Nov 4, 2009, 06:55 PM
    Stratmando

    That it is done By Code and Correct.
    Your local Electric company should be able to provide you with the drawings of their requirements. You will also need a Ground rod, GFI Protection, and Bubble Covers are/have been Required Now(Down here anyway)