Hi, I'm moving a toilet about 3 feet in my basement bathroom. I've jackhammered a trench about a shovel-width, but I wonder how much material (dirt) I have to remove to get it ready for the plumber. Help!
![]() |
Hi, I'm moving a toilet about 3 feet in my basement bathroom. I've jackhammered a trench about a shovel-width, but I wonder how much material (dirt) I have to remove to get it ready for the plumber. Help!
All times are GMT -7. The time now is 11:46 PM. |