What I need to know, exactly, is what the difference in operating costs is between a 13 SEER non-variable-speed unit and a 16 SEER variable-speed unit. The cost difference to us will be $7000 and I want to know how long it will take, or if we can ever, recoup that cost difference in the life of the equipment.