If any body can please advice…
In HVAC total calculated load is 245 TR. But the total connected load is 300 TR. Selected chiller model is based on 245 TR.
1. The selection is correct or wrong?
2. If the selection is write, How to set the GPM, Based on calculated or selected GPM.
3. Is there any calculation for the diversity factor?