Basement plumbing and planning nightmare
I am planning on finsishing my basement this year complete with a kitchen and a bathroom. Of course the sewer line is 3ft above the floor. I figured that I would use the Little Giant sewer ejection system. By what is advertised on the site is that the Little Giant system should be able to handle the toilet, shower, bathroom sink and the kitchen sink drain. My question is about venting all of the drains.
1- Do I still have to vent the toilet since the ejector system has a vent? (I think the answer to this is yes)
2- So if I must vent the toilet in a 3" pipe to the roof can I tie the shower, bathroom sink and kitchen sink into that 3" vent?
3- Could I run the 3" vent to the attic then turn it to tie into the existing 3" vent? (about 20ft away)
4- Could I just use a studor valve on the sinks and shower?
5- Can anyone show me some pics or a diagram of what the plumbing and vents should look like for this type of installation?
Simply put the plumbing has started to turn into a nightmare, I am trying to do this myself without cutting anymore holes than necessary through the 2nd floor and the roof. If anyone can help me out I would greatly appreciate it.
Thanks,
James