Is their a Time Limit on how long a job can run. I have 1 at 10 years and not C.O.ed, Another at 6 years, This one he hired labors to do Plumbing, Tile, Framing, he purchased laser levels for them and floor was over 2" high at one end. Then they had to rip up the
24" Marble Tiles and start over. Countless screwups. The cost of wire incresed dramatically over the 6 years.
What is good to put in a contract concerning a Time Limit?