I'm rebuilding a room over a crawl space,unvented, I have 6 mil on the ground and will have ins. Between the joists.
I have access to the tops of the block that makes up the walls, 2 rows on a footing.
Should I 1--just leave them as is 2-- fill them with the sandy soil from the crawl space 3--fill them with styrafoam beads that I have?
Thanks for your time---Art