Hello,
I am converting my basement into a living space and have an existing toilet waste pipe coming down into the room that I am trying to finish. My joist bays are 2X8 and I have my basement foundation approximately 16" away from the drop. What I would like to do is put a 3" long sweep 90 directly after the toilet flange ( to keep it in the 2X8 bay) and then almost immediately put another 3' long sweep 90 to take it down the basement wall and out of the room. Is that too many 90's in such a short run to accommodate a toilet?
Thank you!
