Sump Pipe Discharge Location
I'm getting set to run some 4" schedule 40 PVC underground away from the house. The question I have is I'm trying to figure out where to end the pipe. I can't go to the ditch in front of my home which would be ideal because I will be crossing over the underground electrical/phone/cable line. I have what I call a drainage creek/ditch straight out from the side of my home where the discharge pipe starts. The creek/ditch does fill up in the spring as well as during extended days of rain, but nothing up towards my yard. I'm worried if I run the pipe to that location, the end of the pipe will be covered with water when the creek/ditch area fills up. I don't have any other steep grades near the creek/ditch because of the grading already done. Should I build a make shift dry-well or are there other suggestions. If a picture is needed, just ask and I can try and produce a fairly detailed one. To run the schedule 40 it would be about 100 ft away from the home.