Shower floor tile job gone bad.
I recently had a contractor install a mosaic tile floor in a shower. Unfortunately the floor was not pitched correctly and is level. So water puddles instead of flowing towards the drain. The shower pan was done correctly prior to this with a preslope and panliner installed below the final mud bed.
Is there any way possible for me to create pitch by adding more thinset on top of the ruined floor without removing the tile, pitching it towards the drain and tiling over that? The drain should still be adjustable up to accommodate if needed. The tile itself is the 3/4" x 3/4" mosaic tumbled marble finish. Would this be an acceptable approach?
I appreciate the help!
Thanks again.