I just bought a house with an unfinished second floor. The bathroom has a 3" soil stack roughed in and stubbed, but thats it. The first floor stack vent is closeby, so theres no problem continuing the second floor stack to meet the venting the first floor stack.
The problem is that the soil stack is in the left hand corner of the room. I want to put the toilet in the right hand corner which would be 6'6" from the stack, and tie the sink and shower into the toilet drain line in between the toilet and stack. I will dry vent both the shower and sink.
Stack... toilet
O ----o----o---- O
... |... |
... |... |
... vent... vent
... |... |
... shower.. sink
Since the toilet is more than 6 feet from the stack (albeit only 6"), do I really need another vent for the toilet, and where would I put it? Or should I just give up the 6" and have a smaller sink cabinet?